Concept Proof · New South Wales · 21 October 2026 · Public-Record Screen (Not a Connection Offer)
Catching Constrained Land Acquisitions Before the DA — and Identifying Buyers When Sales Files Leave Them Blank
These are the New South Wales industrial and greenfield sales, listings, and early scoping filings verified in this search from free weekly Valuer General sales rows, public sale notices, company registers, and planning attachments. A site stays off this screen until a source document has been opened and checked. Nothing here is estimated or guessed.
How the three views below work: Most Relevant ranks the strongest reference cases first—where land under roughly 75 hectares has changed hands, where a network document states a load near 5 megawatts at a constrained zone substation before the Development Application (DA), or where our public-register chain identifies the landowner and developer without a paid title search. Early-Stage Only filters exclusively to land that is for sale, recently settled, or at pre-EIS scoping where no development approval has been granted yet (newest first). All Tracked Sites orders every verified site chronologically (newest first).
How We Identify the Buyer When Government Sales Files Omit the Name
Path A · Targeted Title Dealing Search (Paid Registry)
The free NSW Valuer General weekly sales file gives the property address, land area, settlement date, price, and official Dealing Number (for example, AV189248), but leaves the buyer column blank. Pulling the transfer image or Notice of Sale for that single Dealing Number names the legal party on title.
Path B · $0 Public Register Cross-Match (ASIC + ABR + Planning)
Developers routinely incorporate a street-named company around a contract date. We search the Federal ASIC register for the street name, compute the 11-digit ABN from the 9-digit ACN (Modulus-89), read the office postcode and GST date on the Australian Business Register, and cross-match against council or planning records.
Verification Rule (When a Candidate Becomes a Confirmed Buyer): An office postcode on the business register (such as 2000 or 2011) records the company’s registered office, not the paddock—so a Sydney office postcode neither rules a New South Wales company out nor proves the purchase on its own. A street-named company is written as the confirmed owner or applicant only when (1) the company existed before settlement or lodgement, and (2) a second official record—a council owner column, planning agreement, or scoping report—names that exact company on that land.
Live Verification Status (21 October 2026): Both Mamre Road cards below (`#2` and `#2.2`) have been verified directly against primary documents. 805–817 Mamre Road is the completed chain—connecting the pre-settlement company to the $26,000,000 sale, the Penrith Voluntary Planning Agreement, and Endeavour Energy Design Certification UIS0996. 819–843 Mamre Road next door is the live, unapproved neighbour: the scoping report names the trustee company, the SEARs letter is addressed to Gibb Group, and the application remains open at Prepare EIS.
Why False Matches Stay Off the Buyer Line: Street-named companies incorporated after settlement are rejected automatically. Nelson Road Holdings Pty Ltd was registered on 9 July 2026, whereas 20 Nelson Road settled on 27 June 2025. Maroota Greens Pty Ltd was registered on 31 July 2026 (not registered for GST), whereas the Maroota sale settled on 31 July 2025. The cited Bradfield One number (697 965 201) fails the ACN checksum; the real register entry is 697 347 050. Plenary Bradfield Pty Ltd (ACN 697 581 123) is not on the register. Stockedge Kemps Creek Propco Finco Pty Ltd (office postcode 2000, registered 21 April 2026) has no second record tying it to a specific lot. CDC SPV Landco No 2 Pty Ltd has no business-register page, and a news report ties CDC to a 144 megawatt data centre proposal at 871–901 Mamre Road, which sits far above a microgrid ceiling and stays off these cards.
Area supply, from the 2025 planning report and the 2023 supply polygons
Endeavour’s 2025 Distribution Annual Planning Report publishes each zone substation’s installed capacity, its firm rating, a summer and winter demand series, and a table of identified limitations. A separate 2023 national map draws the supply area of each zone substation. A site is named against a station only when an approximate point falls inside that station’s polygon, or when a letter already names the station. These are planning figures, not a connection offer. The points are not a surveyed lot boundary, so a card without this note has not been placed.
Arndell Park, for Augusta Street. The 1 February 2022 letter already said every breaker there was in use. An approximate point for the street falls in the Arndell Park supply polygon. The 2025 report lists that station at 132/11 kV, two 45 MVA transformers, 90 MVA installed and 45 MVA firm. Every figure in its summer series sits between 25.5 and 31.8 MVA, under that firm rating. The 2022 problem was the feeder breakers, not a zone transformer already over its firm rating in 2025.
Kemps Creek, for 805–817 and 819–843 Mamre Road. Approximate points on Mamre Road fall in the Kemps Creek supply polygon, not the Mamre zone substation. The 2025 report lists Kemps Creek at 33/11 kV, two 25 MVA transformers, 50 MVA installed and 25 MVA firm. Its limitations table says the firm transformer capacity is exceeded, recorded against 2025, with the action to move load to the Western Sydney Airport 22 kV zone substation in 2026. The summer series runs from 13.8 to 33.1 MVA and crosses that 25 MVA firm figure. Mamre zone substation is a different station: 135 MVA installed, 90 MVA firm, with a separate note that firm capacity exceeded in 2026 is resolved by a data centre moving to 132 kV. The November 2023 letter on 805 still said local distribution substations may have some spare capacity. That letter and this 2025 table are both on file, and they are not the same year.
Mungerie Park, for 20 Nelson Road, Box Hill. Approximate points for Nelson Road fall in the Mungerie Park supply polygon. The 2025 report lists it at 132/11 kV, three 45 MVA transformers, 135 MVA installed and 90 MVA firm. The limitations table says firm capacity is exceeded in 2028, with load transfer to Box Hill zone substation. Box Hill is listed as proposed, one 45 MVA transformer, and its firm rating is blank. The lot itself has still not been traced onto a feeder.